A portfolio of plugins and themes designed for Iranian WordPress sites. It brings together site connectivity, notifications, backup workflows and administration, with separate products kept independent where their purpose differs.
I led the needs analysis, product definition and development, using AI tools to support parts of the work. These are self-initiated projects, not client deployments. The products are in development and have not been released for sale.
The planned suite groups ICB, TNP and OBV, with the Suite Bridge as its shared administration component. This is a product direction, not a purchase offer; release and marketplace requirements are still being worked through.
ICB
Iran Connection Booster
Controls selected outbound WordPress requests and provides a carefully scoped outage mode with a validated allowlist.
IN DEVELOPMENTTNP
Telegram Notification Proxy
Routes configured Telegram notifications through an HTTPS proxy, with delivery checks and operational controls.
IN DEVELOPMENTOBV
Offline Backup Vault
A local backup and recovery tool. End-to-end restore evidence is still a release gate, so this product is not presented as ready for sale.
IN DEVELOPMENTBridge
Iran Shield Suite Bridge
A shared WordPress admin area for product status, health checks and suite-level actions.
IN DEVELOPMENT
INDEPENDENT PROJECTS
Related work, separate products.
These projects have their own scope and are not part of the Iran Shield bundle.
Omni
OmniSupport
A unified support-inbox concept for multiple channels. Provider readiness and real-world channel validation remain open.
IN DEVELOPMENTLinkDepth
LinkDepth Pro (ژرفنما)
An independent WordPress product focused on internal-link structure and site navigation depth; it is separate from the Iran Shield suite.
IN DEVELOPMENTThemes
WordPress themes and lookbook
FashionPro Lookbook, FashionPro, LearnMaster, DirMaster and Iran Shield Showcase are maintained as distinct theme or companion-plugin projects.
IN DEVELOPMENT
Where the work stands
The codebase has automated tests and release-preparation work, but passing local tests does not establish marketplace approval, real-world adoption or commercial readiness. Remaining work includes product-specific evidence, documentation, licensing, support and distribution decisions.